Vesgantti Vague Hybrid Mattress-10”/12”-Tight Top Mattress Series -Medium
Please use the code at checkout.
【Vesgantti Lavender Mattress】- The mattress features a lavender stretch knit cover with innovative polyester mesh sides to keep air flowing freely and promote cooling, helping to regulate body temperature for a comfortable night's sleep
【Balance Support】- The 7-zone individual pocketed springs are designed to adapt to your body's curves, providing you with balanced head-to-toe support, helping to release pressure on each part of the body in any sleep positions
【Restful Sleep】- Vesgantti mattress have hundreds of pocket springs that work independently, which can minimize motion transfer from your partner and give you a quiet sleep experience
【Medium Firm Feel】- This hybrid mattress combines multilayer foam and pocket springs for a balance of soft and firm, offering a medium-firm feel that's suitable for most people
【Mattress in a Box】- Vesgantti mattress is compressed and roll-packed in a box that's shipped right to your door. Our mattresses will expand in minutes and get its full size in 72 hours
Product Description
Best Prices,Best Service,
Best Mattress
The Mattresses for your good sleep
Slumbering comfort.
Sleep now,pay over time.
Combining the support of pocket springs with the comfort of memory foam,the Vesgantti Hybrid®mattress is intelligently adapts to the human body for mind-blowing,personalized comfort,Sleeps cool,with perfect hug,bounce and improved pressure relief for side sleepers.

Vesgantti®Cooling Comfort layers
Our coolest design,great for those who sleep hot.these layers include Comfort-Stretch and breathable Cover,Breathable foam,Egg crate foam,Vesgantti®comfort foam.So you can stay cool—and stay asleep.

2.Vesgantti®Pressure Relief Foam Layers
Vesgantti®Relief Foam adapts to your body to dynamically reduce all your pressure points,which means it spoons you just right,all night.

3.Vesgantti®Icoils Layer
Individual responsive support coils aid the Vesgantti®pressure relief foam in dynamic pressure relief and support for the best sleep in the multiverse.They also add years of durability to your bed.

4.Enhanced edge support
It also gives your mattress some extra support,A firm perimeter means getting in and out with ease.








Technical Specification
Country of Origin
Designed in the UK
Mattress Dimensions
TWIN-39" X 75"X 9.6"
TWIN XL - 39"X 80" X 9.6"
QUEEN-60" X 80"X 9.6"
FULL - 54"X 75" X 9.5"
Certification
Our Foam Is Tested And Certified By CertiPUR-US®And BS 7177:2008+A1:2011 Certified To Meet High Standards In Physical Performance,Content,Indoor Emissions And Environmental Stewardship.
Warranty
10-year limited warranty. Read More
Shipping Info
In the US see the details
Shipping cost
Free Shipping In The US
Easy Shipping
No more awkward showroom experiences.Buy online.The vesgantti mattress is delivered direct to your door, compressed in a box.restore in 10 seconds after unpacking.(Please note:once the mattress open and restore,it cannot be roll back again.)
*Your body may need up to 4 week's time to get used to a new mattress

Support where you need it most
In science terms,through our mattress we were able to relieve Key pressure points,reducing shoulder pressure.
Sleep Cool,Cooling Airflow
Our coolest design,great for those who sleep hot,promotes airflow and dissipates body heat so you don’t sweat the bed.
The Ideal Firmness

For Any Sleeper
By adapting to all your pressure points in any sleep position,Vesgantti feels amazing whether you’re a back,stomach,or side sleeper.
BACK SLEEPER
SIDE SLEEPER
STOMACH SLEEPER
BACK SLEEPER
BACK SLEEPER

No-pressure peace of mind.
Free Local Shipping With Vesgantti Mattress

No-pressure peace of mind.
Free Local Shipping With Vesgantti Mattress

No-pressure peace of mind.
Free Local Shipping With Vesgantti Mattress
Frequently asked questions.
- What certifications does the vesgantti mattress have?
Our foam is certified by a lab called CertiPUR-US®.These foams are made without ozone depleters,PBDE flame retardants,mercury,lead and other heavy metals,formaldehyde,phthalates regulated by the Consumer Product Safety Commission.They are Low VOC(Volatile Organic Compound)emissions for indoor air quality(less than 0.5 parts per million).
- How do you set up the vesgantti mattress?
1.Unbox your mattress on its side,next to the foundation or floor.Avoid using a sharp object to open the box as you run the risk of unintentionally slicing your mattress.Unboxing by yourself?Try placing your foot on one of the box flaps to hold it in place while you pull the bedroll out.
2.Position your rolled up the mattress on any solid or slatted foundation and remove the outer layer of plastic wrap.You'll notice that yourmattress has already started to expand at this point.
3. Unwrap and fold the mattress and tear away the inner plastic. If you tear the inner plastic at the top of the bed, you can pull it straight down and off like a sock.
4. Watch yourvesgantti mattress expand and take shape.
Note: It may take up to an hour for yourmattress to fully expand and a few days to fully firm up. Any slight odor will dissipate shortly after setup.
-
What certifications does the vesgantti mattress
have?
Our foam is certified by a lab called CertiPUR-US®. These foams are made without ozone depleters, PBDE flame retardants, mercury, lead and other heavy metals, formaldehyde, phthalates regulated by the Consumer Product Safety Commission. They are Low VOC (Volatile Organic Compound) emissions for indoor air quality (less than 0.5 parts per million).
-
Is there a weight limit for the
vesgantti Mattress?
We do suggest 200 lbs per person or 400 lbs total for hybrid mattress ,and 150lbs per person or300 lbs total formemory foam mattress mattress.
-
Does the Vesgantti mattress work with
any bed foundation?
The vesgantti Bed will work great on any flat, sturdy foundation. Whether you put it on the slats, box foundation or even the floor.
yourvesganttimattress will sit pretty in any room.
-
How do I return matress for full
refund ?
Contact us and we'll help you every step of the way:)vesganttihome@gmail.com