Vesgantti Original Hybird Mattress Grey-8/10/12"- Medium Firm Feel
Please use the code at checkout.
【Posh Hybrid Design】CertiPUR-US certified memory foam and 7-zone pocketed innerspring hybrid construction. Provides adequate support, while also conforming to the body to better release pressure, offering a balanced sleep experience for all sleepers.
【Ultra Quiet】The innerspring work independently of each other with better motion isolation, less noise, and longer service life. Slow-rebound foam provides good cushioning pressure release, effectively absorbing sound and vibration, allowing you to sleep soundly all night.
【Breathable and Healthy】Vesgantti mattress is designed with a breathable knitted fabric cover and multiple layers of foam to help enhance airflow circulation and dissipate body heat for a cool and comfortable sleeping environment.
【Sleep Well】Vesgantti bed mattress offers a medium firm feel, not too firm, not too soft, meeting most people's sleeping preferences, You can enjoy a comfortable sleep every night by using our mattress.
【Mattress In a Box】Vesgantti mattress is compressed and roll-packed in a box that's shipped right to your door. Please wait 48-72 hours (or more) for the mattress to fully expand before using it.
Product Description
Best Prices,Best Service,
Best Mattress
The Mattresses for your good sleep
Slumbering comfort.
Technical Specification
Country of Origin
Designed in the UK
Mattress Dimensions
TWIN-39" X 75"X 9.4"
TWIN XL - 39"X 80"X 9.4"
FULL-54" X 75"X 9.4"
QUEEN - 60"X 80"X 9.4"
KING-76”x 80”X 9.4"
CAL KING - 72"X 84"X 9.4"
Materials
●Breathable Knit Fabrics
●100g/M2 Pp Cotton.
●2 Cm Ves®Comfort Foam
●35g/M2 Breathable Non-Woven Fabrics
●2cm Ves®Support Foam
●320g/M2 PK Solid-Quality Cotton And Blanket
●H20cm Vesgantti®Icoils
●320g/M2 PK Solid-Quality Cotton And Blanket
●100g Strong Bottom Polyester Cover Fabric
●Edge Support Foam And Fabrics CoverCertification
Our foam is tested and certified by CertiPUR-US®and BS 7177:2008+A1:2011 Certified to meet high standards in physical performance,content,indoor emissions and environmental stewardship.
without ozone depleting chemicals and regulated by the Consumer Product Safety Commission Low VOC(Volatile Organic Compound)emissions for indoor air quality(less than 0.5 parts per million).
Warranty
10-year limited warranty. Read More
Shipping Info
In the US see the details
Shipping cost
Free Shipping In The US
Easy Shipping
No more awkward showroom experiences.Buy online.The vesgantti mattress is delivered direct to your door, compressed in a box.restore in 10 seconds after unpacking.(Please note:once the mattress open and restore,it cannot be roll back again.)
*Your body may need up to 4 week's time to get used to a new mattress

Support where you need it most
Sleep cool,Cooling airflow
The Ideal Firmness

Everyone Needs A Support System

For Any Sleeper
BACK SLEEPER
SIDE SLEEPER
STOMACH SLEEPER
BACK SLEEPER
BACK SLEEPER

Free in-home setup
with your Wave mattress
Free Local Shipping With Vesgantti Mattress

Free in-home setup
with your Wave mattress
Free Local Shipping With Vesgantti Mattress

Free in-home setup
with your Wave mattress
Free Local Shipping With Vesgantti Mattress
Frequently asked questions.
- What certifications does the vesgantti mattress have?
Our foam is certified by a lab called CertiPUR-US®.These foams are made without ozone depleters,PBDE flame retardants,mercury,lead and other heavy metals,formaldehyde,phthalates regulated by the Consumer Product Safety Commission.They are Low VOC(Volatile Organic Compound)emissions for indoor air quality(less than 0.5 parts per million).
- How do you set up the vesgantti mattress?
1.Unbox your mattress on its side,next to the foundation or floor.Avoid using a sharp object to open the box as you run the risk of unintentionally slicing your mattress.Unboxing by yourself?Try placing your foot on one of the box flaps to hold it in place while you pull the bedroll out.
2.Position your rolled up the mattress on any solid or slatted foundation and remove the outer layer of plastic wrap.You'll notice that yourmattress has already started to expand at this point.
3. Unwrap and fold the mattress and tear away the inner plastic. If you tear the inner plastic at the top of the bed, you can pull it straight down and off like a sock.
4. Watch yourvesgantti mattress expand and take shape.
Note: It may take up to an hour for yourmattress to fully expand and a few days to fully firm up. Any slight odor will dissipate shortly after setup.
-
What certifications does the vesgantti mattress
have?
Our foam is certified by a lab called CertiPUR-US®. These foams are made without ozone depleters, PBDE flame retardants, mercury, lead and other heavy metals, formaldehyde, phthalates regulated by the Consumer Product Safety Commission. They are Low VOC (Volatile Organic Compound) emissions for indoor air quality (less than 0.5 parts per million).
-
Is there a weight limit for the
vesgantti Mattress?
We do suggest 200 lbs per person or 400 lbs total for hybrid mattress ,and 150lbs per person or300 lbs total formemory foam mattress mattress.
-
Does the Vesgantti mattress work with
any bed foundation?
The vesgantti Bed will work great on any flat, sturdy foundation. Whether you put it on the slats, box foundation or even the floor.
yourvesganttimattress will sit pretty in any room.
-
How do I return matress for full
refund ?
Contact us and we'll help you every step of the way:)vesganttihome@gmail.com