Vesgantti Queen Size Mattress 12 Inch, Cool Sleep Hybrid Mattress in a Box | Fiberglass-Free, Memory Foam & Pocket Springs, Ergonomic Design, Pressure Relief, Medium Firm Feel, 60"*80"*12"

$239.99
Liquid error (snippets/product-form line 139): Computation results in '-Infinity' (Save$-239.99)
Voucher
An extra $0.00 OFF with code Apply $0.00 voucher
Code:
Discount price: $239.99

Please use the code at checkout.

7-Zone Targeted Support With Individual Pocket Springs: Independently encased coils contour to 7 body zones for even weight distribution and balanced support. Reinforced perimeter foam adds edge-to-edge stability so you can use every inch without sagging or rolling off. Supportive yet cushioned — firm enough underneath, yet gentle where you need it most

Pressure Relief & Balanced Support: This 12 inch queen hybrid mattress combines CertiPUR-US certified memory foam with a robust pocket coil base for contouring comfort and responsive support. Multi-layer foam cradles shoulders, hips, and lower back for deeper, more restorative sleep. Designed for the way most people sleep — a versatile balance that suits back, side, and combination sleepers alike

Cooling & Fiberglass-Free Design: This cooling queen mattress features a breathable 3D knitted cover that actively wicks away moisture and body heat all night. High-density memory foam promotes continuous airflow to prevent heat buildup. Every layer is made without fiberglass — a safer, healthier choice for your home. Ideal for hot sleepers and couples who share body heat

Motion Isolation For Couples & Restless Sleepers: Individually wrapped coils inside this supportive queen mattress isolate motion — you won't feel your partner toss, turn, or get up at night. Enjoy deeper, uninterrupted sleep even with restless sleepers or pets on the bed. Pocket spring design also minimizes noise and vibration for disturbance-free sleep

Easy Setup: This Vesgantti queen mattress in a box arrives compressed and rolled for easy delivery to your door. Simply unbox, unroll, and allow 24-72 hours for full expansion. Stand back when unwrapping — it expands quickly. Fits all standard queen bed frames, including box springs, slatted platforms, adjustable bases, and even the floor. Firmness is subjective — how a mattress feels varies by body weight, sleep position, and personal preference


Ships FREE, arriving in 3-5 business days

  • 100-night
    risk-free trial

  • Free shipping
    in a box

  • Honest materials
    No Toxic

  • 10-Year
    Limited Warranty

    Best Prices,Best Service,
    Best Mattress

    The Mattresses for your good sleep
    Slumbering comfort.

    Sleep now,pay over time.

    Luxurious comfort and targeted ergonomic support.scientifically engineered to give you the perfect night's sleep.wake up every morning with your happy face on.

    Comfort-Stretch Cooling Cover

    Vesgantti cover is both super stretchy and breathable so you can feel every last bit of luxurious comfort from your mattress.

    Breathable PP Cotton

    Soft cotton assists with airflow

    Egg-Crate Cooling Foam

    The egg carton shape improves air circulation.have temperature sensitive filling to prevent overheating

    Vesgantti®Enhanced Pressure-Relieving Layer

    Scientifically engineered to intelligently flex under your pressure points.

    Breathable Non-woven Fabrics Layer

    This layer assists with airflow

    Vesgantti®Comfortable Hybrid Transition Layer

    Provides the perfect combination of luxurious softness and support

    Solid-Quality Cotton And Blanket

    Assists the supportive

    Vesgantti®icoils core support layer

    Adapts to your body to dynamically reduce all your pressure points,which means it spoons you just right,all night.
    Effortlessly isolates motion,so you don’t feel your partner,posterity,or pets when they wiggle about.

    Solid-Quality Cotton And Blanket

    Assists the supportive

    Strong Bottom Polyester Cover Fabrics Layer

    Assists the supportive

    Vesgantti®Enhanced Edge Support Layer

    Keep you feel fully supported.

    Technical Specification

    Support where you need it most

    Support where you need it most

    In science terms,through our mattress we were able to relieve key pressure points,reducing shoulder pressure.

    Sleep cool,Cooling airflow

    Vesgantti cooling design promotes airflow and dissipates body heat so you don’t sweat the bed.

    The Ideal Firmness

    Vesgantti is soft where you want it and firm where you need it.The perfect combination of contouring comfort and great support for a good night rest,Simply perfect for sleep.

    The Ideal Firmness

    Everyone Needs A Support System

    The vescomfort®foams and Vesgantti®Icoils were specially designed to keep your spine aligned while eliminating pressure points.adapt perfectly to every point of your body,It’s science you can sleep on.

    Everyone Needs A Support System

    For Any Sleeper

    By adapting to all your pressure points in any sleep position,Vesgantti feels amazing whether you’re a back,stomach,or side sleeper.
    BACK SLEEPER

    BACK SLEEPER

    SIDE SLEEPER

    SIDE SLEEPER

    STOMACH SLEEPER

    STOMACH SLEEPER

    BACK SLEEPER

    BACK SLEEPER

    Back sleepers need support for their lower back.The medium-firm feel of the 11inch box top hybrid mattress helps with alignment,whilst our vescomfort®foams stops your hips sinking in too far.We even tested the innovative Individually wrapped coils and they came up trumps for back sleepers.

    SIDE SLEEPER

    SIDE SLEEPER

    Side sleepers benefit from a touch of softness to cushion shoulders and hips.The memory foam in the original mattress is great for this,because it gently contours to your body.The added zoning also helps with pressure relief.

    STOMACH SLEEPER

    STOMACH SLEEPER

    Sleeping on your stomach can put pressure on your back.Our mattress,which sits on the medium-firm range is ideal,as it helps to keep the spine aligned.
    BACK SLEEPERSIDE SLEEPERSTOMACH SLEEPER
    • BACK SLEEPER
      Back sleepers need support for their lower back.The medium-firm feel of the 11inch box top hybrid mattress helps with alignment,whilst our vescomfort®foams stops your hips sinking in too far.We even tested the innovative Individually wrapped coils and they came up trumps for back sleepers.
      BACK SLEEPER
    • SIDE SLEEPER
      Side sleepers benefit from a touch of softness to cushion shoulders and hips.The memory foam in the original mattress is great for this,because it gently contours to your body.The added zoning also helps with pressure relief.
      SIDE SLEEPER
    • STOMACH SLEEPER
      Sleeping on your stomach can put pressure on your back.Our mattress,which sits on the medium-firm range is ideal,as it helps to keep the spine aligned.
      STOMACH SLEEPER
    Test your mattress without risk. Guaranteed.

    Test your mattress without risk.
    Guaranteed.

    Free shipping with your Wave mattress

    Test your mattress without risk. Guaranteed.

    Test your mattress without risk.
    Guaranteed.

    Free shipping with your Wave mattress

    Test your mattress without risk. Guaranteed.

    Test your mattress without risk.
    Guaranteed.

    Free shipping with your Wave mattress

    Frequently asked questions.

    • What certifications does the vesgantti mattress have?

      Our foam is certified by a lab called CertiPUR-US®.These foams are made without ozone depleters,PBDE flame retardants,mercury,lead and other heavy metals,formaldehyde,phthalates regulated by the Consumer Product Safety Commission.They are Low VOC(Volatile Organic Compound)emissions for indoor air quality(less than 0.5 parts per million).

    • How do you set up the vesgantti mattress?

      1.Unbox your mattress on its side,next to the foundation or floor.Avoid using a sharp object to open the box as you run the risk of unintentionally slicing your mattress.Unboxing by yourself?Try placing your foot on one of the box flaps to hold it in place while you pull the bedroll out.

      2.Position your rolled up the mattress on any solid or slatted foundation and remove the outer layer of plastic wrap.You'll notice that yourmattress has already started to expand at this point.

      3. Unwrap and fold the mattress and tear away the inner plastic. If you tear the inner plastic at the top of the bed, you can pull it straight down and off like a sock.

      4. Watch yourvesgantti mattress expand and take shape.

      Note: It may take up to an hour for yourmattress to fully expand and a few days to fully firm up. Any slight odor will dissipate shortly after setup.

    • What certifications does the vesgantti mattress have?

      Our foam is certified by a lab called CertiPUR-US®. These foams are made without ozone depleters, PBDE flame retardants, mercury, lead and other heavy metals, formaldehyde, phthalates regulated by the Consumer Product Safety Commission. They are Low VOC (Volatile Organic Compound) emissions for indoor air quality (less than 0.5 parts per million).

    • Is there a weight limit for the vesgantti Mattress?

      We do suggest 200 lbs per person or 400 lbs total for hybrid mattress ,and 150lbs per person or300 lbs total formemory foam mattress mattress.

    • Does the Vesgantti mattress work with any bed foundation?

      The vesgantti Bed will work great on any flat, sturdy foundation. Whether you put it on the slats, box foundation or even the floor.

      yourvesganttimattress will sit pretty in any room.

    • How do I return matress for full refund ?

      Contact us and we'll help you every step of the way:)vesganttihome@gmail.com

    See why customers love Vesgantti Products

    Write a review

    Write a review

    • {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content | ellipsis }}

      Continue Reading
      {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content }}

      All Reviews

      All Reviews

      {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content }}

      Customer Reviews

      Based on 1 review
      0%
      (0)
      0%
      (0)
      0%
      (0)
      0%
      (0)
      100%
      (1)
      A
      A
      Buyer Beware

      This is not a quality mattress! Don’t be fooled by the warranty, they aren’t good for it.

      I’ve had this mattress about one and a half years and it’s degraded substantially. It was great at first, then I noticed it was sagging in the middle after about a year. The sagging got worse, and I developed sciatica type back problems. It’s much less supportive in the middle of the bed where I’ve been sleeping. The edges still seem fine in comparison, so the difference is pretty tangible.

      The warranty states that it will cover a mattress that sags by more than 3/4” inch, but when I tried to make a claim with photos I was told that the sagging is normal.

      Don’t be fooled by the good reviews from folks who have not had the mattress long, or who just don’t use it because it’s for a guest room or short term rental. I knew the price was a gamble, but thought I could utilize the warranty if I got a lemon that snuck through Vesgantti’s laughable quality control.

      Happy to amend this review if they will follow through on the 10 year warranty, but I’m not holding my breath.